מחפר זחליHidromek
HMK 140 LC
מחפר זחלי
Hidromek
HMK 140 LC
שנת ייצור
2024
מצב
חדש
מיקום
Hamburg 

התמונות מציגות
הצג מפה
נתונים על המכונה
מחיר ומיקום
- מיקום המוכר:
- Finkenriek 29, 21109 Hamburg, גרמניה
התקשר
פרטי ההצעה
- מזהה מודעה:
- A18387501
- עדכון:
- עודכן לאחרונה בתאריך 10.07.2025
תיאור
Price 125900 + VAT Long-term lease possible From one year up to 4 years possible
HMK 140LC-5, 2.30 M ARM 4.8 M BOOM / 0.7 M3 - 1,200 MM BUCKET
Fuel supply pump
Single-/double-acting hydraulic line
Auxiliary hydraulic line for rotary movement
Dual High Flow - double-acting High Flow hydraulic line.
Setting the flow rate (liters per minute) on the display
?Pressure setting (bar) available on the panel for HMK145 LCSR, but not yet for HMK 140 LC. We hope this will be available by the time the machine goes into production.?
Hydraulic line for quick coupler
Proportional control on the joystick
Safety valves for boom and arm
Boom cylinder pipe protection
Overload warning switch
Rod guard
Pneumatic seat with seat heating
Rain/sun visor
Beacon light
FOPS2 cab protection system
Complete windshield protection cage (stone/rock)
Mono boom 4.6 m
2-piece boom 4.6 m
Front dozer blade
Rear view camera
Cameras right
Bucket: D.R., 0.6 m3 - 985 mm ==> 0.7 m3 - 1145 mm
Without bucket: D.R., 0.6 m3 - 985 mm ==> 0.7 m3 - 1145 mm
2.6 m stick price difference (standard 2.3 m)
500 mm track shoes + 4 additional holes for bolting option
600 mm
700 mm
Travel alarm
LED work lights
Automatic lubrication system Groeneveld Twin Heavy Duty
"Remote Hidromek check-up diagnosis box,
=+1 year extended warranty "
Warranty 1 year or 2,000 hours, whichever comes first.
Kdodjvvfvqopfx Aaqeu
CE certificate
Subject to prior sale and errors. Pictures show original consumption data
המודעה תורגמה אוטומטית. ייתכנו שגיאות בתרגום.
HMK 140LC-5, 2.30 M ARM 4.8 M BOOM / 0.7 M3 - 1,200 MM BUCKET
Fuel supply pump
Single-/double-acting hydraulic line
Auxiliary hydraulic line for rotary movement
Dual High Flow - double-acting High Flow hydraulic line.
Setting the flow rate (liters per minute) on the display
?Pressure setting (bar) available on the panel for HMK145 LCSR, but not yet for HMK 140 LC. We hope this will be available by the time the machine goes into production.?
Hydraulic line for quick coupler
Proportional control on the joystick
Safety valves for boom and arm
Boom cylinder pipe protection
Overload warning switch
Rod guard
Pneumatic seat with seat heating
Rain/sun visor
Beacon light
FOPS2 cab protection system
Complete windshield protection cage (stone/rock)
Mono boom 4.6 m
2-piece boom 4.6 m
Front dozer blade
Rear view camera
Cameras right
Bucket: D.R., 0.6 m3 - 985 mm ==> 0.7 m3 - 1145 mm
Without bucket: D.R., 0.6 m3 - 985 mm ==> 0.7 m3 - 1145 mm
2.6 m stick price difference (standard 2.3 m)
500 mm track shoes + 4 additional holes for bolting option
600 mm
700 mm
Travel alarm
LED work lights
Automatic lubrication system Groeneveld Twin Heavy Duty
"Remote Hidromek check-up diagnosis box,
=+1 year extended warranty "
Warranty 1 year or 2,000 hours, whichever comes first.
Kdodjvvfvqopfx Aaqeu
CE certificate
Subject to prior sale and errors. Pictures show original consumption data
המודעה תורגמה אוטומטית. ייתכנו שגיאות בתרגום.
ספק
הערה: הירשם בחינם או התחבר, כדי לקבל גישה לכל המידע.
נרשם מאז: 2017
שלח בקשה
טלפון & פקס
+49 40 64... מודעות
המודעה שלך נמחקה בהצלחה
אירעה שגיאה