יחידת התזת חולOliver Fritz GmbH & Co. KG
Strahlmittelförderschnecke 5m
יחידת התזת חול
Oliver Fritz GmbH & Co. KG
Strahlmittelförderschnecke 5m
שנת ייצור
2026
מצב
חדש
מיקום
Großenlüder 

התמונות מציגות
הצג מפה
נתונים על המכונה
מחיר ומיקום
- מיקום:
- Industriestraße 5-7, 36137 Großenlüder, Deutschland

התקשר
פרטי ההצעה
- מזהה מודעה:
- A21354307
- עדכון:
- עודכן לאחרונה בתאריך 02.03.2026
תיאור
Abrasive Conveyor Screw 5m with Dosing Hood
For installation as a transverse screw conveyor to the bucket elevator at the end of the hall (pushing abrasive across the full hall width with a forklift)
- 5m + outlet to bucket elevator, solid-blade screw Ø250mm with 5mm thick screw flights.
- Can be used as an abrasive storage hopper. The blasting system draws abrasive as needed via a level probe.
- Depending on installation depth, allows up to 24 hours of uninterrupted blasting without hall cleaning.
- Hall cleaning takes only 10 minutes using a forklift or wheel loader.
- Very low maintenance and repair costs compared to a complete conveyor floor.
- Particularly suitable for very heavy workpieces.
- Lower acquisition costs compared to a full-area conveyor floor.
Bedpsynz Idefx Abgeld
- Reduced foundation costs compared to a full-area conveyor floor.
- Can be pushed across the full hall width as opposed to a sweep pit.
- Very high warranty period.
המודעה תורגמה אוטומטית. ייתכנו שגיאות בתרגום.
For installation as a transverse screw conveyor to the bucket elevator at the end of the hall (pushing abrasive across the full hall width with a forklift)
- 5m + outlet to bucket elevator, solid-blade screw Ø250mm with 5mm thick screw flights.
- Can be used as an abrasive storage hopper. The blasting system draws abrasive as needed via a level probe.
- Depending on installation depth, allows up to 24 hours of uninterrupted blasting without hall cleaning.
- Hall cleaning takes only 10 minutes using a forklift or wheel loader.
- Very low maintenance and repair costs compared to a complete conveyor floor.
- Particularly suitable for very heavy workpieces.
- Lower acquisition costs compared to a full-area conveyor floor.
Bedpsynz Idefx Abgeld
- Reduced foundation costs compared to a full-area conveyor floor.
- Can be pushed across the full hall width as opposed to a sweep pit.
- Very high warranty period.
המודעה תורגמה אוטומטית. ייתכנו שגיאות בתרגום.
ספק
הערה: הירשם בחינם או התחבר, כדי לקבל גישה לכל המידע.
נרשם מאז: 2017
שלח בקשה
טלפון & פקס
+49 6648 ... מודעות
המודעה שלך נמחקה בהצלחה
אירעה שגיאה






