Mixing plant with precise controlMischanlage elktronisch gesteuert
Mixing plant with precise control
Mischanlage elktronisch gesteuert
VB בתוספת מע"מ
38,500 €
שנת ייצור
2023
מצב
משומש
מיקום
Havelsee 

נתונים בסיסיים
מחיר ומיקום
VB בתוספת מע"מ
38,500 €
- מיקום:
- Havelsee, גרמניה

התקשר
פרטים טכניים
מספר מגשי הזנה:
2
פרטי ההצעה
- מזהה מודעה:
- A22368807
- עדכון:
- עודכן לאחרונה בתאריך 21.07.2026
תיאור
Scope of supply of the system
The offer includes:
1. Mixer
• Concrete mixer with a capacity of 9 m³.
• Mixer screw inside the mixer has been renewed and reinforced.
• The mixer is driven by a powerful electric motor.
• The mixer is mounted on four load cells (each with a load capacity of 20 t) for precise weighing of the materials to be mixed.
2. Trough screw conveyor 1
• Conveying system for feeding the mixer.
3. Trough screw conveyor 2
• Conveying system for discharging the finished mixed material.
4. Liquid feed
• Dosing of liquid components via a pumping system from Flux.
5. Electronic control
• Electronic control with a mobile operating unit for weighing and dosing based on the weight increase of the material in the mixer.
Mode of operation
• The mixer is installed on load cells. The current material weight is displayed on the display at all times.
• For example, if a total mixture of 4,500 kg is to be produced, this can be dosed precisely according to a predefined mixing ratio, e.g. 80% main material (3,600 kg), 10% additive (450 kg), 7% additive (315 kg) and 3% additive (135 kg).
• The smaller additives are pre-weighed and fed into trough screw conveyor 1 via the additive hopper using a travelling carriage from big bags.
• Subsequently, the main material is conveyed into the mixer via trough screw conveyor 1 until the desired total weight of 4,500 kg is reached.
Bsdpfx Ahezmyvio Telp
• After that, the feed is stopped via the trough screw conveyor.
• The mixing process then takes place according to the requirements. In our application, the mixing time was approximately 20 minutes.
• After the mixing process is complete, the material is discharged via trough screw conveyor 2. To do this, the direction of rotation of the drive motor is switched at the control panel and the discharge screw conveyor is switched on.
• The finished mixture can then be filled directly into containers or loaded into transport vehicles (in our case, a push-off trailer or manure spreader).
Mixing process based on weight percentages
1. The main material is fed into the trough screw conveyor via the large stainless steel hopper, which then conveys the material into the mixer. In our case, this consisted of solid components from biogas waste.
2. Additional components can be added directly from big bags onto the main material using a second stainless steel hopper and a traverse. This ensures pre-mixing during the conveying process. In our application, biochar and bentonite were added.
3. Liquid components are sprayed directly into the mixer. In our case, we used EMa (activated effective microorganisms) for this purpose.
Optionally, the push-off trailer/manure spreader can be purchased.
המודעה תורגמה אוטומטית. ייתכנו שגיאות בתרגום.
The offer includes:
1. Mixer
• Concrete mixer with a capacity of 9 m³.
• Mixer screw inside the mixer has been renewed and reinforced.
• The mixer is driven by a powerful electric motor.
• The mixer is mounted on four load cells (each with a load capacity of 20 t) for precise weighing of the materials to be mixed.
2. Trough screw conveyor 1
• Conveying system for feeding the mixer.
3. Trough screw conveyor 2
• Conveying system for discharging the finished mixed material.
4. Liquid feed
• Dosing of liquid components via a pumping system from Flux.
5. Electronic control
• Electronic control with a mobile operating unit for weighing and dosing based on the weight increase of the material in the mixer.
Mode of operation
• The mixer is installed on load cells. The current material weight is displayed on the display at all times.
• For example, if a total mixture of 4,500 kg is to be produced, this can be dosed precisely according to a predefined mixing ratio, e.g. 80% main material (3,600 kg), 10% additive (450 kg), 7% additive (315 kg) and 3% additive (135 kg).
• The smaller additives are pre-weighed and fed into trough screw conveyor 1 via the additive hopper using a travelling carriage from big bags.
• Subsequently, the main material is conveyed into the mixer via trough screw conveyor 1 until the desired total weight of 4,500 kg is reached.
Bsdpfx Ahezmyvio Telp
• After that, the feed is stopped via the trough screw conveyor.
• The mixing process then takes place according to the requirements. In our application, the mixing time was approximately 20 minutes.
• After the mixing process is complete, the material is discharged via trough screw conveyor 2. To do this, the direction of rotation of the drive motor is switched at the control panel and the discharge screw conveyor is switched on.
• The finished mixture can then be filled directly into containers or loaded into transport vehicles (in our case, a push-off trailer or manure spreader).
Mixing process based on weight percentages
1. The main material is fed into the trough screw conveyor via the large stainless steel hopper, which then conveys the material into the mixer. In our case, this consisted of solid components from biogas waste.
2. Additional components can be added directly from big bags onto the main material using a second stainless steel hopper and a traverse. This ensures pre-mixing during the conveying process. In our application, biochar and bentonite were added.
3. Liquid components are sprayed directly into the mixer. In our case, we used EMa (activated effective microorganisms) for this purpose.
Optionally, the push-off trailer/manure spreader can be purchased.
המודעה תורגמה אוטומטית. ייתכנו שגיאות בתרגום.
מסמכים
ספק
הערה: הירשם בחינם או התחבר, כדי לקבל גישה לכל המידע.
נרשם מאז: 2021
1 מודעה באינטרנט
שלח בקשה
טלפון & פקס
+49 8191 ... מודעות
ייתכן שגם מודעות אלה יעניינו אותך.
מוצלח
ההודעה שלך נשלחה.
מודעה קטנה
Wartenberg
2,730 km
מסך כוכבים דו-שברירי
Anlagenbau GüntherMULTISTAR ONE / MS ONE
Anlagenbau GüntherMULTISTAR ONE / MS ONE
מוצלח
ההודעה שלך נשלחה.
מודעה קטנה
Berlin
2,956 km
בונקר בורג כפול
מוצלח
ההודעה שלך נשלחה.
מודעה קטנה
Bad Langensalza
2,990 km
מעמיס חצר
ManitouMLA 2-25 H
ManitouMLA 2-25 H
מוצלח
ההודעה שלך נשלחה.
מודעה קטנה
Gmunden
2,591 km
מסנן רוח מצורף
TUKWINDPRO 18
TUKWINDPRO 18
מוצלח
ההודעה שלך נשלחה.
מודעה קטנה
Sinsheim
2,970 km
נעשה שימוש במיקסר מחרשה
MAPWBHP 15000
MAPWBHP 15000
מוצלח
ההודעה שלך נשלחה.
מודעה קטנה
Oberleichtersbach
2,983 km
מפעל הקרנה
Metso2PP 7000/2250
Metso2PP 7000/2250
מוצלח
ההודעה שלך נשלחה.
מודעה קטנה
Bad Salzungen
2,999 km
מסך כוכב ESS
Butzer - EVRESS
Butzer - EVRESS
מוצלח
ההודעה שלך נשלחה.
מודעה קטנה
Polków-Sagały
2,589 km
מחליף ומפנה משטחים
PREMIERV CHANGER
PREMIERV CHANGER
מוצלח
ההודעה שלך נשלחה.
מודעה קטנה
Dinkelscherben
2,807 km
הרמת מגנט בלוק Fe Permanent Fe
die magnetprofisPEM2000x850x200
die magnetprofisPEM2000x850x200
מוצלח
ההודעה שלך נשלחה.
מודעה קטנה
Oberleichtersbach
2,983 km
מסננת כוכבים
unbekanntSternsiebaufsatz
unbekanntSternsiebaufsatz
המודעה שלך נמחקה בהצלחה
אירעה שגיאה











































































